Tender No. |
Title |
Closing Date |
Site Inspection |
|
KEV489 |
Disp. curved intraluminal stapler 25mm. |
06/03/2023 00:00 |
N/A |
⊛ |
RFQ BS 439 |
Boomlift Hydraulic Pipes Refurbishment. |
06/03/2023 11:00 |
N/A |
⊛ |
RFQ BS 451 |
The Provision of Pest Control Services At Ushaka Marine World For 12 Months. |
06/03/2023 11:00 |
N/A |
⊛ |
RFQ BS 452 |
Provide Hygiene Services and Hygiene Equipment At Ushaka Marine World For 3 Months. |
06/03/2023 11:00 |
N/A |
⊛ |
MWP1534TX |
MANUFACTURE, TESTING, SUPPLY, SHIPPING, DELIVERY AND OFF-LOADING OF ESTIMATED QUANTITIES OF 1KV AND 275KV-765KV CURRENT TRANSFORMERS ON AN “AS AND WHEN” REQUIRED BASIS OVER A 5 (FIVE) YEAR PERIOD FOR TRANSMISSION DIVISION. |
02/03/2023 09:59 |
29/09/2022 09:59 |
⊛ |
MWP1640GX |
Control and Instrumentation (C&I) replacement project Unit 1 to 6 at Matimba Power Station. For the complete engineering design, project management, procurement, manufacturing, factory acceptance testing, delivery, off-loading at site, storage, installation, testing, commissioning, optimisation, and as-built documentation for the C&I equipment and supporting systems. |
28/03/2023 09:59 |
12/10/2023 08:00 |
⊛ |
MWP1624TX |
Design and Construction of the new 400kV Gas Insulated Substation (GIS) building including the supply and installation of a new switchgear at Philippi Substation. |
24/04/2023 09:59 |
24/11/2022 09:59 |
⊛ |
MWP1705CX |
Provision of Integrated Prepaid Vending Solution for a period of 10 years |
15/03/2023 09:59 |
27/10/2022 09:59 |
⊛ |
MWP1341TX / BMZ NO 2016 68 540 (501452) |
Design, Engineering, Design Verification/Validation, Material and Equipment Procurement, Quality Management, Factory Inspection/Testing, Transport and Delivery to Site, Site Inspection, Construction, Installation, Interfacing of Control and Protection Systems (Existing and New), Testing And Commissioning, Project Management, Training, Supervision and Interface Management with other parties and all associated works and services until final completion of the work package of the 400kV,500MVar Dynamic Reactive Compensator at Aries Substation in the Northern Cape. |
20/04/2023 09:59 |
21/11/2022 09:59 |
⊛ |
MWP1037TX-R |
The HVDC pole and bypass circuit breakers and associated systems for Apollo Converter Station. |
08/03/2023 09:59 |
16/11/2022 09:59 |
⊛ |
RW10391687/22 |
RFB RW10391687/22 Manufacture, Supply, Delivery, Installation, Construction, Testing and Commissioning of Rain Water Harvesting at Rand Water. Minimum CIDB Contractor Grading 7CE or Higher. |
24/03/2023 12:00 |
N/A |
⊛ |
2496S |
2496S – SHORT TERM POWER PURCHASE AGREEMENT |
31/03/2023 11:00 |
N/A |
⊛ |
CSIR RFP 3550/15/12/2022 |
The CSIR is requesting interested service providers to supply and delivery of computer hardware, peripherals, and accessories for a period of 5 years |
28/02/2023 09:59 |
28/11/2022 11:29 |
⊛ |
FBD-SCM-2022-TEN-0037 |
Bid to supply a Waste Segregation and Repacking Facility for the removal of unwanted items |
24/03/2023 11:00 |
01/12/2022 14:29 |
⊛ |
HOAC_HO_38772 |
FOR THE FRAMING OF PANEL LIST OF SERVICE PROVIDERS OF THE TRACK AND TRACE DEVICE AND RELATED SERVICES ON WAGONS FOR THE PURPOSE OF PROVIDING TRACK AND TRACE INSIGHTS TO THE TFR CUSTOMER, FOR A PERIOD OF TWO (2) YEARS. |
09/03/2023 12:00 |
12/12/2022 11:00 |
⊛ |
R.573-030-2022/1 |
The South African National Roads Agency SOC Limited (SANRAL) invites tenders for the UPGRADING OF NATIONAL ROAD R573 SECTION 3 FROM TOITSKRAAL (KM 20.3) TO MARBLE HALL (KM 43.7). This project is in the province of Limpopo in the district municipality of Sekhukhune and local municipality of Ephraim Mogale. The approximate duration is twenty one (21) months including three (3) months for the Mobilisation Period. |
03/03/2023 11:00 |
17/01/2023 11:00 |
⊛ |
MPARN10548GX |
The provision of Non-Lethal Electric Fence Repair at Arnot Power Station |
01/03/2023 09:59 |
12/01/2023 09:59 |
⊛ |
2470G |
2470G – SUPPLY AND DELIVERY OF ENERGY EFFICIENCY LUMINAIRES |
02/03/2023 11:00 |
15/12/2022 09:59 |
⊛ |
MPTUT10259GXR1 |
SSC UPGRADE PROJECT FOR TWO UNITS AT TUTUKA POWER STATION |
02/03/2023 09:59 |
14/02/2023 09:59 |
⊛ |
RFB 2692/2022 |
Appointment Of A Service Provider For The Provisioning Of Hardware Maintenance, Selected Software Support And Replacement On Wide Area Network (WAN) And Cal Area Network (LAN) (LAN Servers) Equipment For SAPS For A Period Of Three (3) Years . Closing Date Has Been Extended To 10 March 2023 |
10/03/2023 11:00 |
18/01/2023 09:59 |
⊛ |