| Tender No. |
Title |
Closing Date |
Site Inspection |
|
| WC1145ZM |
The Partial Supply and Construction of Medium Voltage (11kV and 22kV) and Low Voltage (440V) Reticulation inclusion of Overhead Lines, Cable and Equipment for Cape Coastal Cluster as and when required for a period of 36 months. |
02/11/2023 09:59 |
N/A |
⊛ |
| MWP2179TX |
The provision of testing, supply, delivery and training on Optical Line Terminating Equipment (OLTE) and Network interface converters on an as and when required basis for a period of five (5) years. Clarification date 19/09/2023, Time 10 00am, Join the meeting via MS team link attached in the word document within tender advert. |
02/11/2023 09:59 |
N/A |
⊛ |
| MWP2184GX |
Bidders are hereby invited to submit proposals for the Refurbishment of Demineralised Water Treatment Plant at Lethabo Power Station for a period of three (03) years. Kindly refer to the NEC3 ECC document Part C3 attached for detailed scope of work |
02/11/2023 09:59 |
N/A |
⊛ |
| MWP1889DX (Validity Extension) |
Tender Validity Extension for the Provision of Calibration and Repairs of Various Testing Measuring Equipment/Instruments/Tools for all Technical Departments within Gauteng Cluster, over a period of 36 months, on an “as and when” required basis This is not a new tender advert but validity extension of tender which closed on 02 May 2023 at 10h00. |
02/11/2023 09:59 |
N/A |
⊛ |
| MWP2115GX |
Clarification 02 & MoM Uploaded Design, Manufacture, Supply, Delivery, Removal, Installation and Commissioning of 2 (two) Generators and Associated Auxiliaries at Kriel Power Station for a period of 4 years |
02/11/2023 09:59 |
N/A |
⊛ |
| Regret Letter MPKEN10170PS |
MPKEN10170PS_Regret Letter_Kendal Power Station Farm Dam Decommissioning Approved Professional Person |
02/11/2023 09:59 |
N/A |
⊛ |
| MPGRO10823GX |
The provision of Maintenance and Engineering Services The calibration on all Mass Meters equipment including spares and its associated communication network and to perform complex technical trouble shooting on the entire systems at Grootvlei Power Station on “as and when required basis” for a period of 5 (five) years |
01/11/2023 15:42 |
N/A |
⊛ |
| MWP2231CX |
Brand Reputation Managed Services |
01/11/2023 09:59 |
N/A |
⊛ |
| MPMAJ10827GX |
Safety Valves Refurbishment at Majuba Power Station for 60 months |
01/11/2023 09:59 |
N/A |
⊛ |
| MWP2224CX |
Requirements for the services of Enterprise Security Architects for a period of 5 years |
01/11/2023 09:59 |
N/A |
⊛ |
| MWP2207GX |
SUPPLY AND DELIVERY OF COUPLINGS FOR A FIVE-YEAR PERIOD FOR STOCK REPLENISHMENT TO LETHABO POWER STATION |
01/11/2023 09:59 |
N/A |
⊛ |
| MPARN10826GX |
The Design, Supply and Installation of a fully functional water based fixed automation fire protection system for all incline conveyors at Arnot Power Station for a period of 8 months |
01/11/2023 09:59 |
N/A |
⊛ |
| MPMAJ10828PS |
THE PROVISION OF GENERAL MAINTENANCE SERVICES FOR THE MAJUBA RAIL PROJECT |
01/11/2023 09:59 |
N/A |
⊛ |
| MPKEN10667GX |
SUPPLY AND DELIVERY OF FILTERS AND LUBE OIL PUMPS ON “AN AS-AND-WHEN” REQUIRED BASIS AT KENDAL POWER STATION |
01/11/2023 09:59 |
N/A |
⊛ |
| OLT2090966 |
supply and delivery of medical supplies for the period of 3 years |
31/10/2023 23:00 |
N/A |
⊛ |
| NC027-Letter to Extend Validity Period of tender for fencing |
Supplying and Installation of 400m steel Panel Perimeter Fence at Pampierstad CNC |
31/10/2023 23:00 |
N/A |
⊛ |
| NC30 Letter to extend validity period of tender |
letter to extend validity period of tender Supply of ADSS Fiber Hardware Materials for Northern Cape and Northwest within Distribution Gemma Cluster on an “as and when required basis” for period of 36 months |
31/10/2023 23:00 |
N/A |
⊛ |
| LPPS0020-R |
This SoW requires entails design and or construction for the listed areas as defined in this document 1. Civil and Structural - reinforced concrete works layer works and drainage 2. Low Pressure Services – installation of pumps 3. Electrical works – supply of electrical power to pumps 4. Configuration management – Plant labelling and document management |
31/10/2023 14:00 |
N/A |
⊛ |
| MWP1635TX Regret Letter |
Regret Letter- Drakensburg, Venus & Pegasus Refurbishment Project Installation |
31/10/2023 10:02 |
N/A |
⊛ |
| WCKBG1139PM (EXTENSION CLOSING DATE 31 OCTOBER 2023) |
WCKBG1139PM - (EXTENSION CLOSING DATE 31 OCTOBER 2023) THE SUPPLY AND DELIVERY OF VARIOUS SPARES AS LISTED BELOW FOR KOEBERG NUCLEAR POWER STATION 1. INTERFACE DIGITAL I/P MODULE 2. INTERFACE DIGITAL OUTPUT CARD 3. MODULE POWER SUPPLY 4. CARD TRUSTED INTERFACE |
31/10/2023 09:59 |
N/A |
⊛ |