Tender Documents available for download. Just look out for the ⊛ sign for tender with attachments

Tender No. Title Closing Date Site Inspection
E2494GXMPCAM THE MAINTENANCE OF ASH AND COAL PLANT EQUIPMENT FOR A PERIOD OF 36 MONTHS AT CAMDEN POWER STATION. 23/02/2026 09:59 06/02/2026 11:00
E2500GCDMPKUS Construction of the Kusile Fuel Station CIDB GRADING 6CE OR HIGHER 24/02/2026 09:59 10/02/2026 09:59
ERI2025BMS10CANCEL TENDER CANCELLATON FOR THE INVITATION TO TENDER FOR THE PROVISION OF ASH AND COAL HANDLING YELLOW PLANT SERVICES REQUIRED FOR THE EFFICIENT RUNNING OF THE ESKOM POWER STATIONS UNDER ERI BMS ASH AND COAL HANDLING OPERATIONS FOR A PERIOD 15 MONTHS ON AN ‘AS AND WHEN REQUIRED BASIS. 18/02/2026 09:59 N/A
E2443DXGOUExtension Tender Validity Extension for the provision of a new covered storage facility at Bronkhorstspruit and minor repairs at Matibestad, Mabopane, Mnandi, Stepdown CNC Brakpan and Ga-Rankuwa within Gauteng Cluster for the period of 18 months 28/02/2026 09:59 N/A
E1152GXMPCAMr Regret Letter - The Provision of Milling Plant reject removal at Camden Power Station for a period of 48 months. 28/02/2026 09:59 N/A
E2499GCDLPMED HYDROGEN PLANT Hydrogen gas is used as a cooling medium in the turbine generators. The gas is used because of its thermal conductivity and very low-density properties. In order to meet the hydrogen requirements at Medupi Power Station, hydrogen shall be produced and stored on site. The gas produced shall be of high purity to ensure safety and generator long term plant health. 27/02/2026 09:59 N/A
E2459GXMPMAT SUPPLY AND DELIVERY CONTRACT OVER 5 YEARS FOR H2 CELLSTACKS TO MATLA POWER STATION. 13/02/2026 09:59 N/A
E1558GXPOUCancel E1558GXPOU-Cancellation-Guide Vanes Journal Refurbishment 27/02/2026 09:59 N/A
E2370GXMPTUTBIDDERS PROVISION OF QUALITY ASSURANCE ACTIVITIES ON OUTAGES (PLANNED AND UNPLANNED), MAINTENANCE AND PROJECTS ACTIVITIES AT UTUKA POWER STATION FOR A PERIOD OF 5 YEARS 20/02/2026 09:59 N/A
E2486GXMPCAM The provision of 24-hour emergency spill response for period of 48 months at Camden Power Station. See attached Appendix A - Scope of work (SOW) for scope details. 16/02/2026 09:59 N/A
E2020DXMPR The pre-qualification of various suppliers for the design, manufacture, testing, and supply of 22 kv and 33 v outdoor, polemounted, three phase gang-operated disconnectors for distribution division lines on an “as and when” required basis within a period of sixty (60) months CIDB Requirements are not applicable. 16/02/2026 09:59 30/01/2026 09:59
GM12600266 500 each x cork a5 notebook 05/02/2026 15:59 N/A
SS12600375 Catering for retirement of patricia hend 04/02/2026 09:59 N/A
SS12600383 Catering s&s_ drm advisory forum meeting 05/02/2026 08:00 N/A
GM12600267 10 each x magnifying glasses 05/02/2026 15:59 N/A
GM12600262 1 activity unit x toner catridge - lexmark 05/02/2026 15:59 N/A
GG12600389 60 each x ns1 cleaner 5l 50 each x green ns8 top coat 30 each x ns8 metal topcoat paint bright metallic 20 each x ns8 metal top coat dark cream 5l 12/02/2026 12:00 N/A
GJ12600529 60 each x ballast lumin hpsv 1000w 250v 110 each x ballast lumin hpsv 150w 240v 12/02/2026 12:00 N/A
GJ12600530 10 each x epoxy resin 816 500g + hardener 05/02/2026 12:00 N/A
GJ12600525 10 each x panel backlit led non-dimmable 600x600mm 05/02/2026 12:00 N/A