(1) Lot A Design, Engineering, Supply, Construction, Installation, testing and Commissioning of Battery Energy Storage Systems (BESS) with a minimum of 35MW/140 MWh of usable capacity and energy, including 5 Years Plants Operation and Maintenance Services. Lot B Design, Engineering, Supply, Construction, and Installation, testing and commissioning of a 2.04 MW Photovoltaic System, Battery Energy

Tender Number:

MWP1698WB

Client:

Eskom

Region:

Northern Cape

Industry:

Electrical

Title:

(1) Lot A Design, Engineering, Supply, Construction, Installation, testing and Commissioning of Battery Energy Storage Systems (BESS) with a minimum of 35MW/140 MWh of usable capacity and energy, including 5 Years Plants Operation and Maintenance Services. Lot B Design, Engineering, Supply, Construction, and Installation, testing and commissioning of a 2.04 MW Photovoltaic System, Battery Energy

Closing Date:

01/03/2023 09:59

Site Inspection Date:

N/A

Tender Description:

Office Location Eskom Head Office1 Maxwell Drive,Megawatt Park, Sunninghill, Sandton, Johannesburg Email Address Mabasoh@eskom.co.za Scope Details (1) Lot A Design, Engineering, Supply, Construction, Installation, testing and Commissioning of Battery Energy Storage Systems (BESS) with a minimum of 35MW/140 MWh of usable capacity and energy, including 5 Years Plants Operation and Maintenance Services and the associated Network Integration Equipment at Eskom Melkhout Substations. Koega Local Municipality, Eastern Cape, South Africa and (2) Lot B Design, Engineering, Supply, Construction, and Installation, testing and commissioning of a 2.04 MW Photovoltaic System, Battery Energy Storage Systems (BESS) with a minimum of 1.5 MW/6 MWh of usable capacity and energy including 5 Years Plant Operation and Maintenance Services, the associated Network Integration Equipment, Capacitor Banks on the Wessel Klipkop 22kV line, Telecommunications Equipment and a 33kV Loop In-Loop-Out Connection on the existing Rietfontein 33kV line including approximately 700m of new 33kV line to the new Mier Substation at Mier Rietfontein Near Rietfontein in the ZF Mgcawu District Municipality (Dawid Kruiper Local Municipality), Northern Cape Province, South Africa Tender box address 1 Maxwell Drive, New Main Reception Area, D-Block West, Ground floor, Megawatt Park, City Sunninghill, Sandton, Johannesburg ZIP/Postal Code 2191 Country Republic of South Africa Description (1) Lot A Design, Engineering, Supply, Construction, Installation, testing and Commissioning of Battery Energy Storage Systems (BESS) with a minimum of 35MW/140 MWh of usable capacity and energy, including 5 Years Plants Operation and Maintenance Services. Lot B Design, Engineering, Supply, Construction, and Installation, testing and commissioning of a 2.04 MW Photovoltaic System, Battery Energy Summary (1) Lot A Design, Engineering, Supply, Construction, Installation, testing and Commissioning of Battery Energy Storage Systems (BESS) with a minimum of 35MW/140 MWh of usable capacity and energy, including 5 Years Plants Operation and Maintenance Services. Lot B Design, Engineering, Supply, Construction, and Installation, testing and commissioning of a 2.04 MW Photovoltaic System, Battery Energy