Tender Details
The scope of work is as follows Stringing The main electrical scope of the project includes • Amending of existing substation layout to achieve the circuit/single line diagram as depicted in the project specific Station Electric Diagram EGEO12P02-SE-E3 Rev 1. Design drawings listed in 5.3 below details how the entire electrical primary plant scope that is to be achieved. • The scope for the s
Tender Number:
MWP1491TX
Client:
Eskom
Region:
Kwa-Zulu Natal
Industry:
Electrical
Title:
The scope of work is as follows Stringing The main electrical scope of the project includes • Amending of existing substation layout to achieve the circuit/single line diagram as depicted in the project specific Station Electric Diagram EGEO12P02-SE-E3 Rev 1. Design drawings listed in 5.3 below details how the entire electrical primary plant scope that is to be achieved. • The scope for the s
Closing Date:
23/08/2022 09:59
Site Inspection Date:
N/A
Tender Description:
Office Location THE TENDER OFFICE Eskom Megawatt Park Retail Centre Megawatt Park 1 Maxwell Drive Sunninghill 2000 Email Address ntinganb@eskom.co.za Scope Details The scope of work is as follows Stringing The main electrical scope of the project includes • Amending of existing substation layout to achieve the circuit/single line diagram as depicted in the project specific Station Electric Diagram EGEO12P02-SE-E3 Rev 1. Design drawings listed in 5.3 below details how the entire electrical primary plant scope that is to be achieved. • The scope for the stringing must be read in conjunction with the design drawings issued to the project manager – see section 5.3. Stringing, earthing, installation of primary plant equipment labels, replacement and or removal of associated equipment, conductor, clamp connections (where required to do so) should be done in accordance with the construction design i.e relevant bay layout schedules EGEO12P02-SE-13. Cabling • Installing new cables as per the approved cable blocks diagrams provided for all the new primary plant equipment installed. • Decommissioned all old cables between the replaced primary plant equipment and the Junction Box • Install the new 6BZ2410 Bus zone protection scheme (24 Bay – 3x Panels) on the allocated space as per the approved control room layout drawing • Install new cables between the new 132kV Bus zone panel and all interfacing panels as per the approved latest cable block drawing provided (0.07/18452). Decommission, remove the old 132kV Bus zone panels and cables once the new 132kV Bus zone is fully commissioned. Tender box address THE TENDER OFFICE Eskom Megawatt Park Retail Centre Megawatt Park 1 Maxwell Drive Sunninghill 2000 Description Georgedale Refurbishment 132kV Stringing and Cabling Summary The scope of work is as follows Stringing The main electrical scope of the project includes • Amending of existing substation layout to achieve the circuit/single line diagram as depicted in the project specific Station Electric Diagram EGEO12P02-SE-E3 Rev 1. Design drawings listed in 5.3 below details how the entire electrical primary plant scope that is to be achieved. • The scope for the s