Tender No. |
Title |
Closing Date |
Site Inspection |
|
692876 |
Supply, Deliver & Install 1x Hydroboiler At NHLS Rob Ferreira Lab, Mpumalanga |
09/12/2021 11:00 |
N/A |
⊛ |
1802124 |
Provision of pest control services for a period of 12 months (1 year) at various NHLS Northern Cape laboratories as per specifications |
10/12/2021 11:00 |
N/A |
⊛ |
1865381 |
Supply And Delivery Of Security Rain Suits X35. Security Shoes X 35. Umbrella X 20 In Sandringham Campus |
08/12/2021 11:00 |
N/A |
⊛ |
1580943 |
Magnetic Stirrer |
13/12/2021 11:00 |
N/A |
⊛ |
1580942 |
Platform Scale |
13/12/2021 11:00 |
N/A |
⊛ |
1580940 |
Fumehood |
13/12/2021 11:00 |
N/A |
⊛ |
1702972 /21-22 |
Request for and Disposable Gowns for the NICD Sandringham |
08/12/2021 11:00 |
N/A |
⊛ |
OLT2002449 |
Supply & Deliver Valve Ball 50MM 10 KPA JIS10K FLANGED. |
07/12/2021 23:00 |
N/A |
⊛ |
Suppliers Forum |
2021 Eskom Online Waterberg
District Suppliers Forum at 10H00. |
09/12/2021 09:59 |
N/A |
⊛ |
KBG2066R |
RE-ISSUE KBG2066R The servicing of plant doors and other general maintenance of non-plant systems for a period of 5 (five) years at Koeberg Operating Unit |
09/12/2021 09:59 |
N/A |
⊛ |
MAT00486 |
For the Supply and delivery of 6 X Air Cooled Condenser Fan Gearboxes to Matimba Power Station.(once-off)
MAT00486 |
09/12/2021 14:00 |
N/A |
⊛ |
LP0044SW Cancellation Letter |
Provision of First Aid, Firefighting, Emergency Preparedness and Evacuation Drill Training within the Limpopo Operating Unit on an “as and when” required basis for a period of 36 months. |
10/12/2021 09:59 |
N/A |
⊛ |
CORP5203- Cancellation |
Provision of a project for Solution Software Licenses, Implementation, Hardware, Training and Change Management, Supply Chain including Information Technology, Operational Technology Infrastructure, and Supporting Infrastructure for the Automated Coal Information System Project for the Primary Energy Department’s (PED) Pit-to-Burn (end-to-end) for all coal Fired Power Stations, sidings and mines |
10/12/2021 09:59 |
N/A |
⊛ |
SBD 1 - OLT2002819 |
Supply & delivery of Gas Analyser (RFQ # OLT2002819) |
12/12/2021 23:00 |
N/A |
⊛ |
OLT2002368 |
Supply & repair damaged tiles & sneeze screens from control room 1-6
1. Preliminaries and Generals
2. Health and safety
3. Cut and remove existing vinyl floor tiles and dispose
4. Supply and install 5,390 x 1,330m wooden partition
5. Supply and install shatterproof glass door on brown alluminium frame
6. Supply and install 5,390 x 0,9m granite top supported wooden partition |
13/12/2021 23:00 |
N/A |
⊛ |
KBG2401 |
ENGINEERING, MANUFACTURING AND INSTALLATION OF THE TENTED STRUCTURE, INCLUDING ELECTRICAL AND FIRE INSTALLATION FOR SGR PROJECT |
14/12/2021 09:59 |
N/A |
⊛ |
MPGXC006680 REGRET LETTER |
Regret letter for the maintenance of all lighting and domestic installations for the period of 5 years at Arnot Power Station |
15/12/2021 09:59 |
N/A |
⊛ |
OLT2002727 |
Fix broken cupboards & leaking toilets
1. Preliminaries and generals.
2. Health and safety.
3. SHOWERS
(a)Break wall, remove rusted galvanized 20mm diameter pipe, dispose, supply and install 20mm copper pipe x 9m
(b) Supply and install 8x shower mixers, shower arms, shower roses and soap holders in showers. |
15/12/2021 23:00 |
N/A |
⊛ |
OLT2002734 |
Supply and repair damages concrete plinths, stainless steel door and bund wall
1. Site Establishment
2. Tools and Equipment
3. Home work home transport
4. Supply and install stainless steel door
5. Replace locking mechanism
6. Supply and replace steel columns size 6m long x 2
7. Prepare and build brick bund wall 40m2
8. Prepare and plaster bund wall 40m2 |
15/12/2021 23:00 |
N/A |
⊛ |
OLT2002731 |
Supply and Replace damaged roof on FAB 1&21
1. Preliminaries and Generals
2. Health and Safety
3. Remove bend IBR sheet and dismantled structure and dispose to a suitable dumping site
4. Supply and deliver 125 x 75 x2mm lipped channels purlins (60m)
5. Supply and deliver 200 x 75 x 4mm Z channels (66m)
6. Supply and deliver 500 x 150 I section bend as per plan (21m) |
15/12/2021 23:00 |
N/A |
⊛ |