| Tender No. |
Title |
Closing Date |
Site Inspection |
|
| pmm-576-22-23 |
catheter multi cvc 3 lumen 20cm |
03/03/2023 00:00 |
N/A |
⊛ |
| pmm-756-22-23 |
81 units, drains wound suction 3mm bellows, 48 units, drains wound suction 6mm bellows |
03/03/2023 00:00 |
N/A |
⊛ |
| KEV1014 |
X-ray films size 24x30/35x43cm |
06/03/2023 00:00 |
N/A |
⊛ |
| KEV1013 |
Electrosurgical pencil & extra length blade. |
06/03/2023 00:00 |
N/A |
⊛ |
| KEV1012 |
Suture monofilament 3/0 & 4/0 |
06/03/2023 00:00 |
N/A |
⊛ |
| KEV1010 |
Clear plastic bags 28cm x 51cm. |
06/03/2023 00:00 |
N/A |
⊛ |
| KEV1011 |
100% Silicone 3-way catheters 30ch x 30ml. |
06/03/2023 00:00 |
N/A |
⊛ |
| KEV489 |
Disp. curved intraluminal stapler 25mm. |
06/03/2023 00:00 |
N/A |
⊛ |
| RFQ BS 439 |
Boomlift Hydraulic Pipes Refurbishment. |
06/03/2023 11:00 |
N/A |
⊛ |
| RFQ BS 451 |
The Provision of Pest Control Services At Ushaka Marine World For 12 Months. |
06/03/2023 11:00 |
N/A |
⊛ |
| RFQ BS 452 |
Provide Hygiene Services and Hygiene Equipment At Ushaka Marine World For 3 Months. |
06/03/2023 11:00 |
N/A |
⊛ |
| MWP1534TX |
MANUFACTURE, TESTING, SUPPLY, SHIPPING, DELIVERY AND OFF-LOADING OF ESTIMATED QUANTITIES OF 1KV AND 275KV-765KV CURRENT TRANSFORMERS ON AN “AS AND WHEN” REQUIRED BASIS OVER A 5 (FIVE) YEAR PERIOD FOR TRANSMISSION DIVISION. |
02/03/2023 09:59 |
29/09/2022 09:59 |
⊛ |
| MWP1640GX |
Control and Instrumentation (C&I) replacement project Unit 1 to 6 at Matimba Power Station. For the complete engineering design, project management, procurement, manufacturing, factory acceptance testing, delivery, off-loading at site, storage, installation, testing, commissioning, optimisation, and as-built documentation for the C&I equipment and supporting systems. |
28/03/2023 09:59 |
12/10/2023 08:00 |
⊛ |
| MWP1624TX |
Design and Construction of the new 400kV Gas Insulated Substation (GIS) building including the supply and installation of a new switchgear at Philippi Substation. |
24/04/2023 09:59 |
24/11/2022 09:59 |
⊛ |
| MWP1705CX |
Provision of Integrated Prepaid Vending Solution for a period of 10 years |
15/03/2023 09:59 |
27/10/2022 09:59 |
⊛ |
| MWP1341TX / BMZ NO 2016 68 540 (501452) |
Design, Engineering, Design Verification/Validation, Material and Equipment Procurement, Quality Management, Factory Inspection/Testing, Transport and Delivery to Site, Site Inspection, Construction, Installation, Interfacing of Control and Protection Systems (Existing and New), Testing And Commissioning, Project Management, Training, Supervision and Interface Management with other parties and all associated works and services until final completion of the work package of the 400kV,500MVar Dynamic Reactive Compensator at Aries Substation in the Northern Cape. |
20/04/2023 09:59 |
21/11/2022 09:59 |
⊛ |
| MWP1037TX-R |
The HVDC pole and bypass circuit breakers and associated systems for Apollo Converter Station. |
08/03/2023 09:59 |
16/11/2022 09:59 |
⊛ |
| RW10391687/22 |
RFB RW10391687/22 Manufacture, Supply, Delivery, Installation, Construction, Testing and Commissioning of Rain Water Harvesting at Rand Water. Minimum CIDB Contractor Grading 7CE or Higher. |
24/03/2023 12:00 |
N/A |
⊛ |
| 2496S |
2496S – SHORT TERM POWER PURCHASE AGREEMENT |
31/03/2023 11:00 |
N/A |
⊛ |
| CSIR RFP 3550/15/12/2022 |
The CSIR is requesting interested service providers to supply and delivery of computer hardware, peripherals, and accessories for a period of 5 years |
28/02/2023 09:59 |
28/11/2022 11:29 |
⊛ |