Tender No. |
Title |
Closing Date |
Site Inspection |
|
NMH257 |
paint wall at staff residence |
16/09/2022 00:00 |
N/A |
⊛ |
ESW-32-23 |
supply and install 14 air conditioners |
20/09/2022 00:00 |
N/A |
⊛ |
sah 191 |
repair of roof at Santombe clinic |
23/09/2022 00:00 |
N/A |
⊛ |
UMP1194-22 |
baby flow neonatal mask size small , medium , and large |
09/09/2022 00:00 |
N/A |
⊛ |
UMP1054-22 |
supply and install 24 000 btu carrier or other approved air conditioner mid-wall splinting heating and cooling with 8 metres of piping , inter connecting cabling and 100 x 40mm pvc trunking |
09/09/2022 00:00 |
N/A |
⊛ |
UMP1051-22 |
supply 35 , 45 , 50 , 60 capacitors full metal |
09/09/2022 00:00 |
N/A |
⊛ |
UMP0865-22-23 |
Supply and install 24 000 btu midwall split heating and cooling air conditioner with 5 metresof pipping , communication cable , armourflex and cantilever bracket set |
09/09/2022 00:00 |
N/A |
⊛ |
UMP0570-22-23 |
supply IPAS easy grip cannula 5mm size 6 , size 7 , size 8 , size 9 , size 10 and size 12 |
09/09/2022 00:00 |
N/A |
⊛ |
UMP0467-22-23 |
supply bilirubinometer with strips |
09/09/2022 00:00 |
N/A |
⊛ |
UMP0466-22-23 |
BT 500 bistos in cubator - skin temperature sensor, medlinker disposable |
09/09/2022 00:00 |
N/A |
⊛ |
UMP0260-22-23 |
Alaris syringe drice extention set |
09/09/2022 00:00 |
N/A |
⊛ |
UMP00028-22-23 |
supply 900mm (3 foot) single end led tube t8 box of 25 |
09/09/2022 00:00 |
N/A |
⊛ |
124.KCD.22.23 |
Blood Alcohol Kit |
09/09/2022 00:00 |
N/A |
⊛ |
EGU 57-22-23 |
Servicing steam reticulation and calorifier plant rooms |
09/09/2022 00:00 |
N/A |
⊛ |
dpm475_OLD |
sensura post op sterile window colostomy bag |
09/09/2022 00:00 |
N/A |
⊛ |
DPM497 |
polglicaprone 3/0 reverse cutting needle |
09/09/2022 00:00 |
N/A |
⊛ |
bchc29-22-23 |
Prepare new stand, move existing shelter to new stand and cast concrete floor |
12/09/2022 00:00 |
N/A |
⊛ |
HLB 124-22-23 |
Plastic storage bins and re-sealable tablet bags |
13/09/2022 00:00 |
N/A |
⊛ |
HLB 116-22-23 |
Building materials for the clinics |
13/09/2022 00:00 |
N/A |
⊛ |
HLB 118-22-23 |
Physiotherapy cycle |
13/09/2022 00:00 |
N/A |
⊛ |